Construction Schedule Infographic Kit: preview of every element in this infographic kit

Construction Schedule Infographic Kit

Infographic kit: vector EPS + 8K PNG, with or without background

$1.99

Buy and download

Checkout is handled by Whop. After payment your ZIP is in your Whop account and linked in your email receipt.

About this kit

Construction Schedule Infographic Kit: a complete infographic kit on one sheet, ready for reports, presentations, dashboards, social posts and print.

What's inside: title block, milestone timeline, winding roadmap with pins, quarterly Gantt chart, growth stairs, headline stat, ranked bars and progress rings.

Files (instant download, one ZIP):

  • Layered vector EPS, editable in Illustrator, Affinity Designer or Inkscape and scalable to any size
  • 8K PNG with background (7680 x 4320 px)
  • 8K transparent PNG (7680 x 4320 px)

Style: gantt, construction, building, engineering, site.

What's included

  • Layered vector EPS, editable in Illustrator, Affinity Designer or Inkscape
  • 8K PNG with background (7680 × 4320 px)
  • 8K transparent PNG (7680 × 4320 px)
Price
$1.99
Formats
EPS · PNG
Works with
Illustrator · Figma · Canva · PowerPoint · Keynote
Delivery
Instant download · one ZIP
License
Commercial use included

License

Commercial use included: use the graphics in personal and client projects, games, videos, streams, websites, ads and print. Reselling or redistributing the source files as they are, or as part of another asset pack, is not permitted.