

Construction Schedule Infographic Kit
Infographic kit: vector EPS + 8K PNG, with or without background
$1.99
購買及下載
付款由 Whop 處理。付款後,ZIP 檔案會出現在你的 Whop 帳戶,電郵收據亦附有下載連結。
關於這套素材
Construction Schedule Infographic Kit: a complete infographic kit on one sheet, ready for reports, presentations, dashboards, social posts and print.
What's inside: title block, milestone timeline, winding roadmap with pins, quarterly Gantt chart, growth stairs, headline stat, ranked bars and progress rings.
Files (instant download, one ZIP):
- Layered vector EPS, editable in Illustrator, Affinity Designer or Inkscape and scalable to any size
- 8K PNG with background (7680 x 4320 px)
- 8K transparent PNG (7680 x 4320 px)
Style: gantt, construction, building, engineering, site.
內含檔案
- 分層向量 EPS,可用 Illustrator、Affinity Designer 或 Inkscape 編輯
- 8K 連背景 PNG(7680 × 4320 px)
- 8K 透明背景 PNG(7680 × 4320 px)
- 價格
- $1.99
- 格式
- EPS · PNG
- 適用軟件
- Illustrator · Figma · Canva · PowerPoint · Keynote
- 交付方式
- 即時下載 · 一個 ZIP
- 授權
- 包含商業用途
授權
包含商業用途:可用於個人及客戶項目、遊戲、影片、直播、網站、廣告和印刷品。不可原樣轉售或分發原始檔案,亦不可把它們放進其他素材包出售。


